Everglades Bridge Extension Proposed by Department of Interior
By Beach Blogger at 30 August, 2010, 5:49 pm
by Gus Moore In my Tamiami Trail Bridge: Our First Plan To Restore The Everglades post, I mentioned that the 1-mile Everglades bridge project is now under construction, and scheduled to conclude in 2013. Great news: the Department of the Interior has proposed adding an additional 5.5 miles of bridging. This will result in 6.5 miles of bridging, along a 10.7-mile stretch of Tamiami Trail. The additional bridging will provide conditions for unconstrained water flow to Shark River Slough. The increased flow will reestablish seasonal water depths that are critical to the survival of many fish and wildlife species. If authorized by Congress, construction could begin in 2013 and would take 3.7 years. A final Environmental Impact Statement will be completed December 17. Is the Everglades Skyway Bridge a Reality? Above: Artist rendering of the Skyway Bridge , proposed and rejected in 2005.

See the rest here:
Everglades Bridge Extension Proposed by Department of Interior
No comments yet.